By: Ir.Dr.Hasnul b.Mohamad Salleh, MIEM, P.Eng. ; Ir.Lim Soon Guan, MIEM, P.Eng.
Introduction
The project was implemented by the Water Supply Department, Ministry of Energy, Green Technology and Water (MEGTW) in year 2006. Sumai Engineering Sdn. Bhd. and Summit Baruliman Sdn. Bhd. Joint Venture, and HLA Associates Sdn. Bhd. were appointed as the Contractor and Engineering Consultant for the project respectively.
The project is located in Besut District of Terengganu State. The project sites are located at the mainland and Perhentian Island of Terengganu as shown in Figure 1.1.
Perhentian Island consists of two islands by the names of Perhentian Kecil Island and Perhentian Besar Island. Read more...
Figure 3.1 : Figure 4.1 : Figure 4.7 : Figure 4.2 - Figure 4.8

