Preparation of Risk Management Plan for Expansion of Mengkuang Dam, Pulau Pinang
Jumaat, 13 April 2012 08:06
By
Hasnul bin Mohamad Salleh1 Ir. Dr., Khor Chai Huat2 & Lai Kim Fui2 and Water Supply Department Project Team3
Keywords : Mengkuang Dam, Dam Expansion, Dam Heightening, Project Risk, Risk Management Plan, Hazard Identification, Risk Assessment, Risk Control
1.0 General View of Project
Under the 10th Malaysia Plan, Federal Government has approved the Expansion of Mengkuang Dam Project, Pulau Pinang. The Expansion of Mengkuang Dam Project will be implemented in two (2) phases. This project is being implemented with the cooperation of Malaysia Government and People’s Republic of China. Read more...
Preparation of Interaction Plan for Expansion of Mengkuang Dam, Pulau Pinang
Selasa, 10 April 2012 09:23
By : Hasnul Mohamad Salleh1 Ir. Dr., Khor Chai Huat2 & Lai Kim Fui2 and Water Supply Department Project Team3
Keywords : Mengkuang Dam, Dam Expansion, Dam Heightening, Interaction Plan
1.0 Project Background
The State of Pulau Pinang is a well-known tourist center and has multi-racial citizens with total population of 1.5 million. Pulau Pinang is also the second most industrilised state in Malaysia. Sg Dua water treatment plant located in Seberang Perai is the largest water treatment in Pulau Pinang. The plant obtains raw water supply from Sg Muda via Sg Dua canal. Sg Muda supplies about 80% of water demand in Pulau Pinang and during drought season, the natural flow in the river is insufficient to meet all domestic, industrial and agricultural irrigation requirement. Baca lagi...
|
Four(4) in One (1) Concept in Project Implementation for Construction of Kahang Dam
By : Ir. Dr. Hasnul Mohamad Salleh1, Ir. Lim Soon Guan2 and Ir. Hasnizal Hashim3
Keywords: Feasibility Study, Value Management, Design, Tender, Project Construction, fast track and Kahang Dam
Abstract
This paper is intended to look at the Kahang Dam project realization through four (4) in one (1) implementation concept perspective. The four (4) elementary implementation components of concern are the Feasibility Study, the Value Management, the Design & Tender and the Project Construction. This paper is directed to outline the project implementation in a matter of fact manner, and is not directed to justify the righteousness for such method of implementation. Baca lagi...
Non-Revenue Water, Impak Kepada Perkhidmatan, Alam Sekitar Dan Kewangan
Khamis, 01 Mac 2012 00:15
Oleh
Ir. Dr. Hasnul Mohammad Salleh1, Normayasuria Abd. Malek2
Kata Kunci
Kehilangan Air Tidak Berhasil (Non Revenue Water),Kehilangan Fisikal, Kehilangan Komersial,Holistik, District Monitoring Zone, District Metering Area, Water Balance,Meter Pengeluaran, Pembaikan Kebocoran Komprehensif, Pengurusan Tekanan Air, Hydraulic Modelling, Nett Present Value (NPV), Pusat Khidmat Pelanggan.
Abstrak
Kertas kerja ini disediakan bertujuan untuk membuka mata pembaca berkenaan kesan dan impak Non Revenue Water kepada perkhidmatan bekalan air, alam sekitar dan kewangan Negara. Non Revenue Water (NRW) kini merupakan salah satu isu yang hangat diperkatakan di peringkat global. Isu NRW ini melambangkan prestasi pengurusan bekalan air di sesebuah negara. Malaysia telah pun mengambil inisiatif berkenaan NRW ini semenjak tahun 80-an lagi. Kini,kerajaan telah menyarankan agar pihak Bekalan Air Negeri memberi penumpuan yang lebih terhadap masalah NRW ini kerana ianya memberi impak yang besar kepada hasil kutipan negara amnya, dan negeri khususnya Di bawah Pindaan Jadual Kesembilan Perlembagaan Persekutuan, Kerajaan Negeri mempunyai bidang kuasa terhadap sumber air, kawasan tadahan air dan lembangan sungai. Kerajaan Persekutuan akan mengawal selia industri perkhidmatan air dari segi pelesenan dan kawal selia operator perkhidmatan. Kerajaan Persekutuan melalui Majlis Sumber Air Negara mempunyai kuasa ke atas air apabila sungai merentasi sempadan dua negeri dan negeri-negeri berkenaan tidak dapat mencapai persetujuan tentang penggunaan dan kawalan air sungai tersebut. Baca lagi...
|